🌋 Planetary event

First US alternating-current system at Great Barrington

Primera red de corriente alterna de EE. UU. en Great Barrington

Date
1886 · confidence high
Place
Great Barrington, Massachusetts, United States
Credited to
William Stanley Jr. (for Westinghouse)
Field
Matter & energy

What was discovered

With closed-core transformers designed by Stanley, a 500 V-to-3000 V line lit offices and shops in town in March 1886. It was the test bed for Westinghouse's alternating-current system.

What it led to

  • Westinghouse's commercial AC system
  • the war of the currents with Edison
  • commercial power transformers
🕸️ View in the graph

Built on

Made possible

Links

Sources✓ verified 2026-11-04