🛠️ Invention or technique

TAZARA Railway (Tanzania-Zambia)

Ferrocarril TAZARA (Tanzania-Zambia)

Date
1970-1975 · confidence high
Place
Dar es Salaam, Tanzania
Credited to
China, Tanzania and Zambia
Field
Movement

What it is

A 1,860 km line between Dar es Salaam and Kapiri Mposhi (Zambia), built with an interest-free Chinese loan and some 50,000 Chinese workers. It let Zambia export copper without passing through apartheid-era Rhodesia and South Africa.

Built between 1970 and 1975 and officially handed over in 1976; its later performance has been poor for lack of maintenance and its modernisation has been debated.

What it led to

  • export of Zambian copper through an independent African port
  • a model of China-financed infrastructure in Africa

Links

Sources✓ verified 2026-11-06